In lieu of an abstract, here is a brief excerpt of the content:

Constructions Th~ foundalion 5tOn~ of th~ n~w developm~nt was laid by Sir Murray MacLehose, the Chancellor, in May 1978 at a c~remony outside th~ Main Building. Th~ Vic~-Chancellor addressing th~ guests at !h~roundation.5Ion~c~r~mony. [18.118.9.146] Project MUSE (2024-04-26 08:44 GMT) The Knowles Building, for administrative offices and teaching departments. Swire Hall, the student residential and amenities buildingabove Bonham Road, to be completed in 1980. , -- - • • j I 206 ----::The Dental Teaching Clinic at the junction of Eastern Str«1 and Second Street in Sai ying pun, The: Pauline ChaR Building al Sauoon Road. an amenity building for medical and denw studenu. The new large and small science buildings seen from Roberl Black College. The Library and the K.Jlowles Building can be st:cn at the back, The new laboratory animal unit building at Sassoon Road '1.°7 [18.118.9.146] Project MUSE (2024-04-26 08:44 GMT) 208 N~w science buildings replacing those demolished on PokJulam Road. c rt,N. 17 • Steps to the ne"' buildings, leading from the Library and the Knowles Building level. The new engineering building. ,. [18.118.9.146] Project MUSE (2024-04-26 08:44 GMT) The seal of the University, in use since 19J3. ...

Share